Price demand

Company Profile

Company profie

The company HUPRO SYSTEMS SE introduces you a unique technology of self-supporting steel arch structures, which has a tradition since 1985. During this period, we have carried out more than 3 000 projects worldwide. This technology enables to overlay space width from 9 m to 50 m without any additional supporting structure. We offer you an opportunity to use our unique 2 in 1 system, where the self-supporting structure serves as a roof coating, so you can achieve the profitability of the entire planned construction.

In the manufacturing process, our company uses only those materials that guarantee both maximum weather and chemical resistance, which significantly extends the maintenance- free system. We offer you a guarantee on our system of up to 30 years. HUPRO ® system is certified, which ensures that the product that we offer, meets the most stringent criteria for the type of material used (self-supporting construction produced from Aluzinc ® material, stainless joints) as well as the production of construction and subsequent final inspection. We also hold ISO 9001 and ISO 14001 certificates.

Our technology allows the construction even in such places, where other types of prefabricated buildings and tent objects are not possible to use in terms of climatic snow loads and wind. Possible climatic load of our system is up to 600 kg/m2.

HUPRO® system is characterized by maximum originality and attractive design, which is beyond uniformity of right angles and precisely for that reason it is widely used in the most complex architectural works.

Technology

Arch constructions are the most effective spatial structures. They are light, while staying extremely rigid and strong. Smart combination of static principles of vaults and shells (formed by longitudinal and transverse forming of the basic steel part in a shape of a W) is easily applied especially for large spans using overlapped areas of up to 50 metres in width.

The basic element is made of structural steel S320GD coated by ALUZINC® and protective layer EASY FILM. The thickness of the steal elements is from 0,8 mm to 2 mm, depending on the span of hall and climate conditions of the construction site. The connection of the individual parts is made with stainless steel joints. The steel arch structure is anchored directly to the foundation using chemical steel anchors.

The advantage is that it is also a relatively lightweight steel structure in comparison to other building materials. This advantage brings significantly lower demands for the foundation of the object and also reduces the cost of shipping and installation. Excellent static properties of the system are useful in extreme weather conditions, construction is resistant to earth tremors of up to 7 on the Richter scale.

Hall Ventilation

The hall is standardly equipped with an active ventilation system, which works on the principle of a thermodynamic buoyancy without the need to use electricity. The side suction fans mounted at the bottom of the hall shell provide a supply of air that is subsequently exhausted by Lomanco® active roof fans. This system prevents excessive moisture and condensation in both insulated and non-insulated halls and also perfectly prevents overheating of the insulation and interior of the halls in hot summer months.

Natural Lightning in the Halls

We use transparent lightning segments or roof windows built in the self-supporting shell of the building for lightning. It is possible to use normal windows or transparent alternatives (panels) in the front and rear of the hall building for lightning.

Hall Insulation

Insulations of halls can be done using HUPRO construction system. This system allows to select insulation thickness, fire resistance, acoustic design and interior design of the halls.

Installation

Individual basic components of the system are bonded by stainless steel joints, of which a compact unit is made after assembly on site. The individual units are then lifted by crane techniques and fixed using chemical steel anchors into the foundation. The construction of an object with an area of 1 000 square meters is normally realized within 14 days.

Transport

The basic parts of Hupro system are delivered on pallets with size of 700 x 3 100 mm. On one pallet it is possible to ship such a number of parts, which will cover about 100 m2 ground- plan area after installation. One truck transports the material, which covers about 1 000 m2 ground- plan area, which represents significant savings in transportation costs.

Services

We offer comprehensive projection, production and supply services. Our design team will prepare free of charge a study of the hall, and if you are interested, we can offer you a project documentation for the building according to your requirements. We have got processed a number of solutions, design details, insulation systems, interior ceilings, front walls ... We also deal with complex projects of sports fields, including floors, acoustic solutions, heating, lighting .... We are happy to visit you and help you with our experience and expertise to realize your ideas.

The self-supporting HUPRO construction requires minimal maintenance during its very long life. After exceeding the typical norm values of the climate load, it is necessary to carry out the maintenance of the buildings according to the regulations.

Tyto webové stránky používají k poskytování služeb, personalizaci reklam a analýze návštěvnosti soubory cookie. Používáním těchto webových stránek souhlasíte s použitím souborů cookie. Další informace