HUPRO SYSTEMS SE was founded in 1985 and today is a leading manufacturer of prefabricated steel halls.

Profil spoločnosti

We have more than 40+ years of experience in the construction of halls.

HUPRO SYSTEMS SE have been designing, supplying and building uniquely engineered, self-supporting, steel arch structures throughout Europe since 1985. Using state of the art technology, we have built more than 3000 structures worldwide, for a broad spectrum of purposes including: sports arenas, agricultural buildings, manufacturing, storage and industrial uses. Our unique arch technology, enables us to overlay a space with a roof width ranging from 9 to 50 metres, without the necessity of additional supporting structures.

Manufacturing process

Our manufacturing process: Our company uses materials that guarantee both maximum weather and chemical resistance, significantly extending the life of the building. We offer a guarantee on our system of up to 30 years.

The self-supporting HUPRO construction requires minimal maintenance.

HUPRO ® system is fully certified, ensuring that the product we deliver meets the most stringent standards. We use Aluzinc ® material, with stainless joints, in all our self-supporting structures, and all production, construction and final inspection is carried out to the highest specifications and standards. We hold ISO 9001 and ISO 14001 certificates.

Our technology

Our technology enables construction even in locations where other types of prefabricated and tent structures cannot be used due to climatic loads from snow and wind. The possible climatic load of our system is up to 600 kg/m².

The HUPRO® system is characterized by maximum originality and an attractive design that deviates from the uniformity of right angles. For this reason, it has a wide range of applications in the most complex architectural projects.

Arch structures are the most efficient spatial structures. They are lightweight yet extraordinarily strong and durable. The ingenious combination of the static principles of the arch and shell (formed by longitudinal and transverse shaping of the basic steel component in the shape of a W) allows for seamless application, especially for large spans with a covered area of up to 50 m in width.

The basic component is made of structural steel S 320GD with an ALUZINC® surface coating and an EASY FILM protective layer. The thickness of the steel components ranges from 0.8 mm to 2 mm, depending on the span of the hall and the climatic conditions at the construction site. The individual components are joined using stainless steel connections. The steel arch structure is anchored to the foundations using chemical steel anchors.

Another advantage is the relatively low weight of the steel structure compared to other building materials. This characteristic significantly reduces the foundation requirements for the structure as well as transportation and assembly costs. The excellent static properties of this system allow for use in extreme weather conditions, and the structure is resistant to earthquakes with a magnitude of up to 7 on the Richter scale.

Hall Ventilation

The hall is standardly equipped with an active ventilation system, which works on the principle of a thermodynamic buoyancy without the need to use electricity. The side suction fans mounted at the bottom of the hall shell provide a supply of air that is subsequently exhausted by Lomanco® active roof fans. This system prevents excessive moisture and condensation in both insulated and non-insulated halls and also perfectly prevents overheating of the insulation and interior of the halls in hot summer months.

Natural Lightning in the Halls

We use transparent lightning segments or roof windows built in the self-supporting shell of the building for lightning. It is possible to use normal windows or transparent alternatives (panels) in the front and rear of the hall building for lightning.

Hall Insulation

Insulations of halls can be done using HUPRO construction system. This system allows to select insulation thickness, fire resistance, acoustic design and interior design of the halls.

Installation

Individual basic components of the system are bonded by stainless steel joints, of which a compact unit is made after assembly on site. The individual units are then lifted by crane techniques and fixed using chemical steel anchors into the foundation. The construction of an object with an area of 1 000 square meters is normally realized within 14 days.

Transport

The basic parts of Hupro system are delivered on pallets with size of 700 x 3 100 mm. On one pallet it is possible to ship such a number of parts, which will cover about 100 m2ground- plan area after installation. One truck transports the material, which covers about 1 000 m2 ground- plan area, which represents significant savings in transportation costs.

Services

We offer comprehensive projection, production and supply services. Our design team will prepare a free of charge study of the hall, and if you are interested, we can offer you a project documentation for the building according to your requirements. We have got processed a number of solutions, design details, insulation systems, interior ceilings, front walls ... We also deal with complex projects of sports fields, including floors, acoustic solutions, heating, lighting .... We are happy to visit you and help you with our experience and expertise to realize your ideas.

The self-supporting HUPRO construction requires minimal maintenance during its very long life. After exceeding the typical norm values of the climate load, it is necessary to carry out the maintenance of the buildings according to the regulations.

paleta 1

CONTACT US

Employee List

Name: Marek Mišura

Phone: +421 905 354 520

E-mail: misura@huprohaly.sk

unnamed 3
sktelc1 min
unnamed
unnamed 4
unnamed 3
unnamed 2